Load Shedding Backup · Gauteng
Load Shedding Backup in Tembisa, Ekurhuleni
Cut Eskom exposure with engineered three-phase solar PV and battery storage for commercial and industrial facilities in Tembisa, Ekurhuleni. Typical four-year payback, Section 12B tax deduction in year one, and tariff mitigation against annual increases from City of Ekurhuleni.
- Typical payback
- 4 yrs
- Yield / kWp
- 1 700 kWh
- Section 12B
- 100% yr 1
- Response
- 48 hrs
SAPVIA PV GreenCard practices · NRS 097-2-1 · SANS 10142 · Section 12B ready
Load Shedding Backup engineered for commercial and industrial facilities in Tembisa
High Eskom tariffs and power instability directly affect commercial and industrial facilities operations across Tembisa, Ekurhuleni. Reyds provides engineered, three-phase commercial solar PV and battery storage systems tailored for daytime load shifting and peak demand clipping. Sites in Tembisa sit on the R21 corridor, where rising demand charges and outage risk make generation on site the lowest-risk hedge available.
Backup engineering that keeps production lines, cold chain and POS systems running through Stage 6 schedules.
Pair your cooling, refrigeration and commercial aircon systems directly with solar PV generation to cut high peak-demand electrical charges. Thermal pre-cooling during peak irradiance hours shifts chiller demand off the City of Ekurhuleni account entirely.
Local grid and industrial context
- Distribution authority: City of Ekurhuleni, feeder capacity confirmed before design freeze
- Industrial corridor: R21 corridor
- Tembisa commercial nodes
- HVAC and refrigeration load coupling assessed on every facility audit
Indicative 500kW build for a facility in Tembisa
- System capacity
- 500 kWp (500kW)
- Modules
- 900 x tier-1 Bloomberg-rated monocrystalline
- Roof / yard area
- ~2 800 m2
- Inverter platform
- 2 x 250kW central inverters
- Storage option
- 500kWh containerised LFP
- Annual generation
- ~850 000 kWh
| Component | Engineered specification | Standard |
|---|---|---|
| Hybrid / grid-tied inverters | Sungevity, Atess, Deye and Huawei three-phase 400V units, 30kW to 250kW blocks | NRS 097-2-1, IEC 62109 |
| PV modules | Tier-1 Bloomberg-rated monocrystalline 555-620Wp, 30-year linear performance warranty | IEC 61215, IEC 61730 |
| Battery storage | Lithium iron phosphate (LFP) 51.2V cabinets and 233-5 000kWh containerised racks, 6 000+ cycles at 90% DoD | IEC 62619, UN38.3 |
| Mounting structures | Aluminium rail on IBR / corrugated / standing seam; ballasted or bolted on concrete; galvanised steel ground frames | SANS 10160 wind loading |
| Structural roof load | 12-18 kg/m2 additional dead load flush-mount, 22-28 kg/m2 tilted arrays, verified per truss design | SANS 10162 sign-off |
| Protection and metering | Type 2 SPD, DC isolators, AC changeover, CT metering with remote monitoring portal | SANS 10142-1 |
What is included in Tembisa
- Prioritised essential-load distribution boards
- Automatic transfer without operator intervention
- Runtime modelling per shift pattern
- SSEG registration and NRS 097-2-1 documentation
- Remote monitoring portal with performance reporting
- Section 12B asset register for your auditors
Questions from Tembisa operators
How long does a 500kW installation in Tembisa take?
A 500kW plant on a facility in Tembisa typically takes 4 to 10 weeks from signed order, including structural assessment, City of Ekurhuleni SSEG paperwork and commissioning.
Do we need approval from City of Ekurhuleni?
Yes. Any grid-connected embedded generation in Tembisa, Ekurhuleni must be registered as SSEG. Reyds handles the full application, professional engineer sign-off and NRS 097-2-1 compliance documentation.
Can the system run our aircon and refrigeration during load shedding?
With hybrid inverters and LFP storage, cooling, refrigeration and commercial aircon can be carried through outages while also clipping peak-demand charges on your facility account.