50kW · Botswana

50kW Solar System for Industrial Parks in Francistown

Cut Eskom exposure with engineered three-phase solar PV and battery storage for industrial parks in Francistown, North-East. Typical four-year payback, Section 12B tax deduction in year one, and tariff mitigation against annual increases from Botswana Power Corporation.

Typical payback
4.1 yrs
Yield / kWp
1 700 kWh
Section 12B
100% yr 1
Response
48 hrs

SAPVIA PV GreenCard practices · NRS 097-2-1 · SANS 10142 · Section 12B ready

50kW engineered for Industrial Parks in Francistown

High Eskom tariffs and power instability directly affect industrial parks operations across Francistown, North-East. Reyds provides engineered, three-phase commercial solar PV and battery storage systems tailored for daytime load shifting and peak demand clipping. Sites in Francistown sit on the A1 corridor, where shared metering and constrained supply capacity make generation on site the lowest-risk hedge available.

Coupling chillers, refrigeration and commercial aircon directly to PV generation to flatten peak-demand charges. Industrial Parks carry a load profile dominated by multi-tenant mixed light industrial load, which is exactly where solar generation overlaps hardest with your billing peaks.

Pair your cooling, refrigeration and commercial aircon systems directly with solar PV generation to cut high peak-demand electrical charges. Thermal pre-cooling during peak irradiance hours shifts chiller demand off the Botswana Power Corporation account entirely.

Local grid and industrial context

  • Distribution authority: Botswana Power Corporation, feeder capacity confirmed before design freeze
  • Industrial corridor: A1 corridor
  • Francistown industrial sites
  • HVAC and refrigeration load coupling assessed on every industrial park audit

Indicative 50kW build for a industrial park in Francistown

System capacity
50 kWp (50kW)
Modules
90 x tier-1 Bloomberg-rated monocrystalline
Roof / yard area
~280 m2
Inverter platform
Huawei SUN2000 50KTL
Storage option
50-100kWh LFP
Annual generation
~85 000 kWh
ComponentEngineered specificationStandard
Hybrid / grid-tied invertersSungevity, Atess, Deye and Huawei three-phase 400V units, 30kW to 250kW blocksNRS 097-2-1, IEC 62109
PV modulesTier-1 Bloomberg-rated monocrystalline 555-620Wp, 30-year linear performance warrantyIEC 61215, IEC 61730
Battery storageLithium iron phosphate (LFP) 51.2V cabinets and 233-5 000kWh containerised racks, 6 000+ cycles at 90% DoDIEC 62619, UN38.3
Mounting structuresAluminium rail on IBR / corrugated / standing seam; ballasted or bolted on concrete; galvanised steel ground framesSANS 10160 wind loading
Structural roof load12-18 kg/m2 additional dead load flush-mount, 22-28 kg/m2 tilted arrays, verified per truss designSANS 10162 sign-off
Protection and meteringType 2 SPD, DC isolators, AC changeover, CT metering with remote monitoring portalSANS 10142-1

What is included in Francistown

  • Inverter-driven compressor matching
  • Thermal storage pre-cooling strategies
  • Lower notified maximum demand
  • SSEG registration and NRS 097-2-1 documentation
  • Remote monitoring portal with performance reporting
  • Section 12B asset register for your auditors

Questions from Francistown operators

How long does a 50kW installation in Francistown take?

A 50kW plant on a industrial park in Francistown typically takes 4 to 10 weeks from signed order, including structural assessment, Botswana Power Corporation SSEG paperwork and commissioning.

Do we need approval from Botswana Power Corporation?

Yes. Any grid-connected embedded generation in Francistown, North-East must be registered as SSEG. Reyds handles the full application, professional engineer sign-off and NRS 097-2-1 compliance documentation.

Can the system run our aircon and refrigeration during load shedding?

With hybrid inverters and LFP storage, cooling, refrigeration and commercial aircon can be carried through outages while also clipping peak-demand charges on your industrial park account.

Explore related solar pages

Call nowWhatsAppGet quote