100kW · Gauteng

100kW Solar System for Industrial Parks in Ga-Rankuwa

Cut Eskom exposure with engineered three-phase solar PV and battery storage for industrial parks in Ga-Rankuwa, Pretoria. Typical four-year payback, Section 12B tax deduction in year one, and tariff mitigation against annual increases from City of Tshwane.

Typical payback
3.8 yrs
Yield / kWp
1 700 kWh
Section 12B
100% yr 1
Response
48 hrs

SAPVIA PV GreenCard practices · NRS 097-2-1 · SANS 10142 · Section 12B ready

100kW engineered for Industrial Parks in Ga-Rankuwa

High Eskom tariffs and power instability directly affect industrial parks operations across Ga-Rankuwa, Pretoria. Reyds provides engineered, three-phase commercial solar PV and battery storage systems tailored for daytime load shifting and peak demand clipping. Sites in Ga-Rankuwa sit on the R80 Mabopane corridor, where shared metering and constrained supply capacity make generation on site the lowest-risk hedge available.

Steel-frame ground arrays for sites with spare yard or land, optimised tilt for maximum winter yield. Industrial Parks carry a load profile dominated by multi-tenant mixed light industrial load, which is exactly where solar generation overlaps hardest with your billing peaks.

Pair your cooling, refrigeration and commercial aircon systems directly with solar PV generation to cut high peak-demand electrical charges. Thermal pre-cooling during peak irradiance hours shifts chiller demand off the City of Tshwane account entirely.

Local grid and industrial context

  • Distribution authority: City of Tshwane, feeder capacity confirmed before design freeze
  • Industrial corridor: R80 Mabopane corridor
  • Ga-Rankuwa Industrial Site
  • HVAC and refrigeration load coupling assessed on every industrial park audit

Indicative 100kW build for a industrial park in Ga-Rankuwa

System capacity
100 kWp (100kW)
Modules
180 x tier-1 Bloomberg-rated monocrystalline
Roof / yard area
~560 m2
Inverter platform
2 x Huawei SUN2000 50KTL
Storage option
100-215kWh LFP
Annual generation
~170 000 kWh
ComponentEngineered specificationStandard
Hybrid / grid-tied invertersSungevity, Atess, Deye and Huawei three-phase 400V units, 30kW to 250kW blocksNRS 097-2-1, IEC 62109
PV modulesTier-1 Bloomberg-rated monocrystalline 555-620Wp, 30-year linear performance warrantyIEC 61215, IEC 61730
Battery storageLithium iron phosphate (LFP) 51.2V cabinets and 233-5 000kWh containerised racks, 6 000+ cycles at 90% DoDIEC 62619, UN38.3
Mounting structuresAluminium rail on IBR / corrugated / standing seam; ballasted or bolted on concrete; galvanised steel ground framesSANS 10160 wind loading
Structural roof load12-18 kg/m2 additional dead load flush-mount, 22-28 kg/m2 tilted arrays, verified per truss designSANS 10162 sign-off
Protection and meteringType 2 SPD, DC isolators, AC changeover, CT metering with remote monitoring portalSANS 10142-1

What is included in Ga-Rankuwa

  • Optimal 25-30 degree northern tilt
  • Easy cleaning and maintenance access
  • Expandable in MW-scale blocks
  • SSEG registration and NRS 097-2-1 documentation
  • Remote monitoring portal with performance reporting
  • Section 12B asset register for your auditors

Questions from Ga-Rankuwa operators

How long does a 100kW installation in Ga-Rankuwa take?

A 100kW plant on a industrial park in Ga-Rankuwa typically takes 4 to 10 weeks from signed order, including structural assessment, City of Tshwane SSEG paperwork and commissioning.

Do we need approval from City of Tshwane?

Yes. Any grid-connected embedded generation in Ga-Rankuwa, Pretoria must be registered as SSEG. Reyds handles the full application, professional engineer sign-off and NRS 097-2-1 compliance documentation.

Can the system run our aircon and refrigeration during load shedding?

With hybrid inverters and LFP storage, cooling, refrigeration and commercial aircon can be carried through outages while also clipping peak-demand charges on your industrial park account.

Explore related solar pages

Call nowWhatsAppGet quote