100kW · North West

100kW Solar System for Hospitals in Brits

Cut Eskom exposure with engineered three-phase solar PV and battery storage for hospitals in Brits, Bojanala. Typical four-year payback, Section 12B tax deduction in year one, and tariff mitigation against annual increases from Madibeng Municipality.

Typical payback
4.3 yrs
Yield / kWp
1 700 kWh
Section 12B
100% yr 1
Response
48 hrs

SAPVIA PV GreenCard practices · NRS 097-2-1 · SANS 10142 · Section 12B ready

100kW engineered for Hospitals in Brits

High Eskom tariffs and power instability directly affect hospitals operations across Brits, Bojanala. Reyds provides engineered, three-phase commercial solar PV and battery storage systems tailored for daytime load shifting and peak demand clipping. Sites in Brits sit on the N4 Platinum Corridor, where zero tolerance for supply interruption make generation on site the lowest-risk hedge available.

Synchronising existing gensets with PV and storage so diesel becomes a last resort instead of a monthly cost centre. Hospitals carry a load profile dominated by critical theatre, imaging and sterilisation load, which is exactly where solar generation overlaps hardest with your billing peaks.

Pair your cooling, refrigeration and commercial aircon systems directly with solar PV generation to cut high peak-demand electrical charges. Thermal pre-cooling during peak irradiance hours shifts chiller demand off the Madibeng Municipality account entirely.

Local grid and industrial context

  • Distribution authority: Madibeng Municipality, feeder capacity confirmed before design freeze
  • Industrial corridor: N4 Platinum Corridor
  • Brits industrial area
  • Madibeng agri belt
  • HVAC and refrigeration load coupling assessed on every hospital audit

Indicative 100kW build for a hospital in Brits

System capacity
100 kWp (100kW)
Modules
180 x tier-1 Bloomberg-rated monocrystalline
Roof / yard area
~560 m2
Inverter platform
2 x Huawei SUN2000 50KTL
Storage option
100-215kWh LFP
Annual generation
~170 000 kWh
ComponentEngineered specificationStandard
Hybrid / grid-tied invertersSungevity, Atess, Deye and Huawei three-phase 400V units, 30kW to 250kW blocksNRS 097-2-1, IEC 62109
PV modulesTier-1 Bloomberg-rated monocrystalline 555-620Wp, 30-year linear performance warrantyIEC 61215, IEC 61730
Battery storageLithium iron phosphate (LFP) 51.2V cabinets and 233-5 000kWh containerised racks, 6 000+ cycles at 90% DoDIEC 62619, UN38.3
Mounting structuresAluminium rail on IBR / corrugated / standing seam; ballasted or bolted on concrete; galvanised steel ground framesSANS 10160 wind loading
Structural roof load12-18 kg/m2 additional dead load flush-mount, 22-28 kg/m2 tilted arrays, verified per truss designSANS 10162 sign-off
Protection and meteringType 2 SPD, DC isolators, AC changeover, CT metering with remote monitoring portalSANS 10142-1

What is included in Brits

  • Fuel spend cut by up to 80%
  • Reduced wet-stacking and service intervals
  • Closed-transition changeover logic
  • SSEG registration and NRS 097-2-1 documentation
  • Remote monitoring portal with performance reporting
  • Section 12B asset register for your auditors

Questions from Brits operators

How long does a 100kW installation in Brits take?

A 100kW plant on a hospital in Brits typically takes 4 to 10 weeks from signed order, including structural assessment, Madibeng Municipality SSEG paperwork and commissioning.

Do we need approval from Madibeng Municipality?

Yes. Any grid-connected embedded generation in Brits, Bojanala must be registered as SSEG. Reyds handles the full application, professional engineer sign-off and NRS 097-2-1 compliance documentation.

Can the system run our aircon and refrigeration during load shedding?

With hybrid inverters and LFP storage, cooling, refrigeration and commercial aircon can be carried through outages while also clipping peak-demand charges on your hospital account.

Explore related solar pages

Call nowWhatsAppGet quote