Ground-Mounted PV Arrays · Gauteng

Ground-Mounted PV Arrays in Nasrec, Johannesburg

Cut Eskom exposure with engineered three-phase solar PV and battery storage for commercial and industrial facilities in Nasrec, Johannesburg. Typical four-year payback, Section 12B tax deduction in year one, and tariff mitigation against annual increases from City Power.

Typical payback
4 yrs
Yield / kWp
1 700 kWh
Section 12B
100% yr 1
Response
48 hrs

SAPVIA PV GreenCard practices · NRS 097-2-1 · SANS 10142 · Section 12B ready

Ground-Mounted PV Arrays engineered for commercial and industrial facilities in Nasrec

High Eskom tariffs and power instability directly affect commercial and industrial facilities operations across Nasrec, Johannesburg. Reyds provides engineered, three-phase commercial solar PV and battery storage systems tailored for daytime load shifting and peak demand clipping. Sites in Nasrec sit on the N1 and N12 interchange, where rising demand charges and outage risk make generation on site the lowest-risk hedge available.

Steel-frame ground arrays for sites with spare yard or land, optimised tilt for maximum winter yield.

Pair your cooling, refrigeration and commercial aircon systems directly with solar PV generation to cut high peak-demand electrical charges. Thermal pre-cooling during peak irradiance hours shifts chiller demand off the City Power account entirely.

Local grid and industrial context

  • Distribution authority: City Power, feeder capacity confirmed before design freeze
  • Industrial corridor: N1 and N12 interchange
  • Expo Centre Nasrec
  • HVAC and refrigeration load coupling assessed on every facility audit

Indicative 750kW build for a facility in Nasrec

System capacity
750 kWp (750kW)
Modules
1350 x tier-1 Bloomberg-rated monocrystalline
Roof / yard area
~4 200 m2
Inverter platform
3 x 250kW central inverters
Storage option
750kWh containerised LFP
Annual generation
~1 275 000 kWh
ComponentEngineered specificationStandard
Hybrid / grid-tied invertersSungevity, Atess, Deye and Huawei three-phase 400V units, 30kW to 250kW blocksNRS 097-2-1, IEC 62109
PV modulesTier-1 Bloomberg-rated monocrystalline 555-620Wp, 30-year linear performance warrantyIEC 61215, IEC 61730
Battery storageLithium iron phosphate (LFP) 51.2V cabinets and 233-5 000kWh containerised racks, 6 000+ cycles at 90% DoDIEC 62619, UN38.3
Mounting structuresAluminium rail on IBR / corrugated / standing seam; ballasted or bolted on concrete; galvanised steel ground framesSANS 10160 wind loading
Structural roof load12-18 kg/m2 additional dead load flush-mount, 22-28 kg/m2 tilted arrays, verified per truss designSANS 10162 sign-off
Protection and meteringType 2 SPD, DC isolators, AC changeover, CT metering with remote monitoring portalSANS 10142-1

What is included in Nasrec

  • Optimal 25-30 degree northern tilt
  • Easy cleaning and maintenance access
  • Expandable in MW-scale blocks
  • SSEG registration and NRS 097-2-1 documentation
  • Remote monitoring portal with performance reporting
  • Section 12B asset register for your auditors

Questions from Nasrec operators

How long does a 750kW installation in Nasrec take?

A 750kW plant on a facility in Nasrec typically takes 4 to 10 weeks from signed order, including structural assessment, City Power SSEG paperwork and commissioning.

Do we need approval from City Power?

Yes. Any grid-connected embedded generation in Nasrec, Johannesburg must be registered as SSEG. Reyds handles the full application, professional engineer sign-off and NRS 097-2-1 compliance documentation.

Can the system run our aircon and refrigeration during load shedding?

With hybrid inverters and LFP storage, cooling, refrigeration and commercial aircon can be carried through outages while also clipping peak-demand charges on your facility account.

Explore related solar pages

Call nowWhatsAppGet quote