10MW+ · Gauteng

10MW+ Solar System for Warehouses in Ekandustria

Cut Eskom exposure with engineered three-phase solar PV and battery storage for warehouses in Ekandustria, Bronkhorstspruit. Typical four-year payback, Section 12B tax deduction in year one, and tariff mitigation against annual increases from City of Tshwane.

Typical payback
4.1 yrs
Yield / kWp
1 700 kWh
Section 12B
100% yr 1
Response
48 hrs

SAPVIA PV GreenCard practices · NRS 097-2-1 · SANS 10142 · Section 12B ready

10MW+ engineered for Warehouses in Ekandustria

High Eskom tariffs and power instability directly affect warehouses operations across Ekandustria, Bronkhorstspruit. Reyds provides engineered, three-phase commercial solar PV and battery storage systems tailored for daytime load shifting and peak demand clipping. Sites in Ekandustria sit on the N4 East corridor, where vast unused roof area and rising fixed demand charges make generation on site the lowest-risk hedge available.

Structuring your installation so the full renewable energy allowance is claimable in the year of commissioning. Warehouses carry a load profile dominated by daytime lighting, forklift charging and dock equipment, which is exactly where solar generation overlaps hardest with your billing peaks.

Pair your cooling, refrigeration and commercial aircon systems directly with solar PV generation to cut high peak-demand electrical charges. Thermal pre-cooling during peak irradiance hours shifts chiller demand off the City of Tshwane account entirely.

Local grid and industrial context

  • Distribution authority: City of Tshwane, feeder capacity confirmed before design freeze
  • Industrial corridor: N4 East corridor
  • Ekandustria manufacturing zone
  • HVAC and refrigeration load coupling assessed on every warehouse audit

Indicative 10MW+ build for a warehouse in Ekandustria

System capacity
10000 kWp (10MW+)
Modules
18000 x tier-1 Bloomberg-rated monocrystalline
Roof / yard area
~56 000 m2
Inverter platform
Multiple 5MW MV blocks on 11/22kV
Storage option
10MWh+ BESS park
Annual generation
~17 000 000 kWh
ComponentEngineered specificationStandard
Hybrid / grid-tied invertersSungevity, Atess, Deye and Huawei three-phase 400V units, 30kW to 250kW blocksNRS 097-2-1, IEC 62109
PV modulesTier-1 Bloomberg-rated monocrystalline 555-620Wp, 30-year linear performance warrantyIEC 61215, IEC 61730
Battery storageLithium iron phosphate (LFP) 51.2V cabinets and 233-5 000kWh containerised racks, 6 000+ cycles at 90% DoDIEC 62619, UN38.3
Mounting structuresAluminium rail on IBR / corrugated / standing seam; ballasted or bolted on concrete; galvanised steel ground framesSANS 10160 wind loading
Structural roof load12-18 kg/m2 additional dead load flush-mount, 22-28 kg/m2 tilted arrays, verified per truss designSANS 10162 sign-off
Protection and meteringType 2 SPD, DC isolators, AC changeover, CT metering with remote monitoring portalSANS 10142-1

What is included in Ekandustria

  • 100% first-year depreciation modelling
  • SARS-ready asset register and invoices
  • Effective payback shortened by up to 27%
  • SSEG registration and NRS 097-2-1 documentation
  • Remote monitoring portal with performance reporting
  • Section 12B asset register for your auditors

Questions from Ekandustria operators

How long does a 10MW+ installation in Ekandustria take?

A 10MW+ plant on a warehouse in Ekandustria typically takes 4 to 10 weeks from signed order, including structural assessment, City of Tshwane SSEG paperwork and commissioning.

Do we need approval from City of Tshwane?

Yes. Any grid-connected embedded generation in Ekandustria, Bronkhorstspruit must be registered as SSEG. Reyds handles the full application, professional engineer sign-off and NRS 097-2-1 compliance documentation.

Can the system run our aircon and refrigeration during load shedding?

With hybrid inverters and LFP storage, cooling, refrigeration and commercial aircon can be carried through outages while also clipping peak-demand charges on your warehouse account.

Explore related solar pages

Call nowWhatsAppGet quote